The second batch of schools, collectively valued at around £38 million, includes two secondary schools and two primary schools and together will provide learning spaces for 3230 pupils.The schools are funded via the Education Funding Agency (EFA) and are Withernsea High School, Wolfreton School and Sixth Form College, Neasden and Foredyke Primary Schools. All the schools are being built on their existing locations, and include an element of demolition to replace the current buildings.
Mike Silcock said:
“We’re delighted to be working with Bam Construction on this exciting schools programme, reflecting our experience in designing modern, innovative and cost effective educational environments.”
Silcock Leedham has been appointed to provide full electrical and mechanical services from RIBA Stage 1 to 7 including both Revit and thermal modelling input. We have been integral in the development of the strategic design philosophy for this project, providing early stage thermal model assistance and design advice to optimise window design, orientation, glazing as well as mechanical and electrical services elements to provide a high quality design solution.